Dear Experts,
We are upgrading the system from SAP-BI 7.0 system to the SAP-BW with HANA.
Kindly tell me the activities required by the SAP-BW consultant to take at ECC System side and SAP-BW system side before we start the up gradation.
Regards,
Suresh.