HI Andreas ,
Thanks for this .
I will try this however have some questions -
1) I am thinking of parallel implementation. wanted to create a copy structure for0FI_GL_10 in BW and linking that copy structure to 0FI_GL_12 in ECC , i want to keep running both extractors for some time and then decommission 0FI_GL_10 later , is it possible to run both in parallel ?
2) we have a requirement to have RDA implemented in system due to time critical reporting in BW for FIGL area. Looks like 0FI_GL_12 supports RDA but as I understood RDA usually have DSO in the flow in BW where as this DS doesn't require one(in general flow) .Do i need to use dso in case of this scenario while using RDA(additive mode) ? kindly advice if you are aware of the steps.
we are on BI 7.10 , ECC -EHP 5
Thanks in advance.
Regards,
Chetan Rajoriya