Hi,
thanks for your reply. I have done realignment in the past for selected customers and materials without having this issue. But yesterday, I did realignment without any characteristics restriction and have this issues.
I have couple of questions and clarifications
1. What are the certain procedures do I need to follow before realignment and after.
2. Do I need to do INIT W/O data transfer or with Data transfer. If its INIT W/O data transfer, what time stamp should I reset it to in KEB5. The last successful load was 30.09.2014 at 21:30:35 and Realignment was done on 01.10.2014. should I reset to the last successful delta or after the realignment.
I have checked CE1XXX table and there are 3000 records created between 30.09.2014 and 02.10.2014
Thanks,
Bhat